Thinking about building your next home in Johnstown? You are not alone. With steady growth around Licking County and convenient access to Columbus, new construction can be a smart way to get the layout, finishes, and location you want. In this guide, you will learn where to find lots, how to vet builders, what permits and inspections to expect, how a typical timeline unfolds, and what to budget. Let’s dive in.
Find buildable lots in Johnstown
Finding the right lot is the foundation of a smooth build. Start broad, then narrow to parcels that fit your goals and budget.
Smart search channels
- Licking County Auditor and GIS parcel search for official lot boundaries, acreage, and tax records.
- Local MLS listings for “vacant land” and “building lots,” including subdivision opportunities in and around the Village of Johnstown.
- Village and township websites for planned developments and infrastructure projects that may release new lots.
- Local builders who market lots tied to their plans, plus home shows and builder events.
- A real estate agent with new-construction experience who can flag off-market land and evaluate constraints early.
Lot due diligence checklist
Before you write an offer, confirm the basics that affect cost and feasibility:
- Zoning and setbacks. Verify permitted uses, density, and required setbacks with the Village of Johnstown or Licking County planning offices.
- Utilities. Ask about water, sewer, natural gas, electric, and telecom service. Inside village limits you are more likely to have municipal water and sewer. Rural lots often require private well and septic.
- Septic and well feasibility. Contact the Licking County Health Department to confirm soil conditions and percolation requirements for on-site systems.
- Floodplain and wetlands. Review FEMA flood maps and county GIS. Floodplains can change buildable area and insurance needs.
- Easements and covenants. Read the deed, plat, and any HOA covenants for restrictions, architectural review, and building envelopes.
- Soil and topography. Order a soils test and a topographic survey to check for rock, shallow bedrock, high water table, or slope issues.
- Access and roads. Confirm whether the road is public or private, who maintains it, and any improvement obligations.
- Taxes and assessments. Ask the county auditor about current taxes and any special assessments for streets, sewer, or other infrastructure.
Pro tip: Get a written estimate for water or sewer tap fees and, if applicable, the cost to drill a well and install septic. These can materially affect your budget.
Choose the right builder
The builder you choose sets the tone for quality, communication, and schedule. Decide which type fits your vision, then vet carefully.
Builder types at a glance
- Production builders. Predesigned floor plans and streamlined options. Often faster, commonly tied to subdivision lots.
- Semi-custom builders. Base plans with more room for finish selections and some plan tweaks.
- Custom builders. Full design flexibility with longer planning and build timelines.
- Design-build firms. Architecture and construction under one roof, which can simplify coordination when scope and budget are well defined.
How to vet a builder
- Local track record. Ask how long they have built in Licking County and request addresses of recent projects.
- References. Call at least three recent clients and visit completed homes if possible.
- Insurance and licensing. Request certificates of insurance and confirm subcontractors are insured. Ask about any relevant memberships or professional affiliations.
- Transparent specs. Review a line-item specification sheet that lists brands, insulation, windows, HVAC, and finishes.
- Project management. Confirm who manages the job daily and how often you will receive updates.
Contract must-haves
- Price structure. Understand whether the contract is fixed price, cost-plus, or has a guaranteed maximum.
- Payment schedule. Tie draws to clear milestones and require lien waivers from subcontractors.
- Change orders. Define how changes are approved and priced, plus contingency amounts for the unexpected.
- Code and inspections. Reference the Ohio Building Code and required inspections in writing.
- Selections and allowances. Set deadlines for finish choices and include realistic allowance amounts to avoid overages.
Warranties and service
Ask for a written warranty program. Many builders offer a one-year workmanship warranty and a longer structural warranty. Clarify how punch list items are handled after move-in and whether warranties are transferable.
Permits and inspections in Johnstown
Ohio uses statewide building codes, enforced locally by village, township, or county offices. Knowing who does what will help you plan the sequence.
Who issues permits
- Inside the Village of Johnstown. Contact the village planning, zoning, and building offices for permits and procedures.
- Unincorporated areas. Coordinate with Licking County building, planning, and zoning departments.
Common permits you may need
- Building permit for new residential construction
- Electrical, plumbing, and mechanical trade permits
- Site or grading permit for earthwork
- Driveway permit for connections to county or township roads
- Septic system approval from the Licking County Health Department for on-site systems
- Well permit or required notices for private wells
- Stormwater and erosion control approvals
Typical inspection checkpoints
- Pre-pour footings
- Foundation and pre-backfill
- Rough plumbing, electrical, and mechanical
- Framing
- Insulation
- Drywall or firestopping if required
- Final inspections and certificate of occupancy
Expect your builder to schedule inspections and share passed reports. You should receive your certificate of occupancy before move-in.
Fees and cost considerations
Plan for building permit fees, water and sewer tap-in fees, possible sewer assessments, stormwater or road impact fees, and any township or county fees tied to development. Ask the village or county for written estimates early.
Your construction timeline
Every build is unique, but you can set expectations by understanding the phases. Weather, supply chains, and site conditions can shift timing.
Spec vs. custom timing
- Spec or production homes. Often 4 to 8 months once construction starts, depending on the builder and selections.
- Custom builds. Commonly 8 to 12 months or more after the start of construction, plus time for design and permits beforehand.
Sample timeline overview
- Lot due diligence and purchase: weeks to months
- Design and permits: 4 to 12 weeks
- Site work and foundation: 2 to 6 weeks
- Framing and exterior shell: 3 to 8 weeks
- Rough-ins and insulation: 2 to 5 weeks
- Interior finishes: 4 to 12 weeks
- Final inspections, punch list, and occupancy: 1 to 4 weeks
What can slow things down
- Complex site prep such as rock removal or drainage work
- Seasonal weather delays, especially heavy rain or deep freezes
- Material or appliance backorders
- Frequent plan changes or late finish selections
- Backlogs in permit review during busy periods
Keep your build on schedule
- Request a written schedule with milestone dates and draw triggers.
- Build in a time buffer and clarify remedies for missed deadlines.
- Make selections by the deadlines and monitor allowance balances.
- Ask for regular updates from the site manager and confirm inspection dates.
Finance your new build
Choosing the right loan structure can save time and reduce closing costs. Talk with a local lender who regularly handles construction loans in Licking County.
Common loan paths
- Construction-to-permanent loan. One close, then it converts to a mortgage at completion.
- Standalone construction loan. Separate construction loan, then refinance into a permanent mortgage at the end.
- Builder financing. Some production builders offer in-house or preferred lender programs. Compare terms.
- Government-backed options. FHA and USDA programs may be available depending on eligibility. VA construction options exist for qualified buyers.
Budget checklist
- Lot purchase and closing costs
- Site work, grading, driveway, and utility extensions or tap fees
- Foundation costs and potential subsurface surprises
- Construction costs for the base home and any upgrades
- Soft costs such as architectural plans, engineering, surveys, and permits
- Financing costs, including interest during construction and lender fees
- Carrying costs like property taxes, insurance, and temporary utilities
- Landscaping and final paving
- Contingency reserve of 5 to 10 percent for the unexpected
Taxes, assessments, and insurance
Your assessed value typically increases when construction is complete, which can change your property tax bill. Ask the Licking County Auditor about reassessment timing. Some subdivisions include special assessments for infrastructure. Lenders often require builder’s risk insurance during construction, so confirm who provides coverage and what personal liability protection you need.
Local next steps and contacts
Use this quick plan to move from idea to action:
- Identify two or three lots and request a current survey and title search. Confirm zoning and utility availability with the Village of Johnstown or Licking County, depending on location.
- If the lot is not on municipal sewer or water, call the Licking County Health Department about septic and well feasibility.
- Shortlist three builders. Ask for references, sample contracts, insurance certificates, and detailed specifications.
- Speak with lenders about construction-to-permanent loan options and get pre-qualified to set your budget.
- Request written estimates for tap fees, permit fees, and any impact fees from the village or county.
- Schedule soils testing and a topographic survey before finalizing your build contract to avoid costly surprises.
When you are ready to explore lots or interview builders, you do not have to go it alone. With deep experience in new construction across Columbus suburbs and Licking County, the Perez Team can help you align the right lot, builder, and financing path for your goals. If you are considering building in Johnstown, connect with Angel Perez for local guidance and a smooth plan from site selection to closing.
FAQs
How long does new construction take in Johnstown?
- Custom builds commonly take 8 to 12 months after construction starts, while spec or production homes often finish in 4 to 8 months, plus extra time for design and permits.
Will my Johnstown lot need septic or have sewer?
- It depends on location; lots within village service areas are more likely to have municipal sewer, while rural parcels may require septic, so confirm with the village or Licking County Health Department.
How do I vet a builder in Licking County?
- Ask for recent references, verify insurance, review detailed specifications and sample contracts, and confirm who manages the job and how change orders are handled.
What permits and inspections should I expect?
- Expect building and trade permits, possible septic or well permits, erosion control approvals, and phased inspections leading to a final certificate of occupancy.
What hidden costs surprise first-time builders?
- Utility tap or extension fees, unforeseen site work such as rock removal or drainage fixes, septic or well installation, driveway costs, and finish allowance overages.
How should I budget for taxes and insurance on a new build?
- Plan for reassessed property taxes after completion and builder’s risk insurance during construction, and ask your lender what coverage they require.